On-site robotic and automated techniques for building renovation and new construction
Type of action: HORIZON Innovation Actions
This Destination targets the energy demand side, notably a more efficient use of energy in buildings and industry. It contributes to the activities of the Strategic Energy Technology Plan (SET Plan) and its implementation working groups.
This Destination contributes directly to the Strategic Plan’s Key Strategic Orientations ‘Green transition’, ‘Digital transition’ and ‘A more resilient, competitive, inclusive and democratic Europe’.
In line with the Strategic Plan, the overall expected impact of this Destination is to contribute to the ‘Using energy in buildings and industry in an efficient, affordable and sustainable way’.
The main impacts to be generated by topics under this Destination are:
Highly energy-efficient and climate neutral European building stock
The energy performance of the European building stock is improved at an accelerated pace, contributing to the EU's energy security, while the buildings and the built environment have reduced climate and environmental impact throughout their life cycle.
The energy renovation and construction of buildings are cost-efficient, affordable and less disruptive.
The buildings are increasingly interacting with the users, energy system and their environment while operating in an integrated, resilient, secure, smart and flexible manner.
The buildings and the built environment are more climate resilient, accessible, inclusive and delivers multiple benefits which improve the quality of life, health and well-being for all users.
Industry
The energy efficiency of EU energy intensive industries is improved, their consumption of fossil fuel and their GHG and other pollutants emissions are drastically reduced, notably through cost-effective electrification, use of renewable energy, heat recovery, thereby preserving / enhancing their global competitiveness.
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination. For additional information please see “Restrictions on the participation of legal entities established in China” found in General Annex B of the General Annexes.
">General conditions
1. Admissibility Conditions: Proposal page limit and layout
described in Annex A and Annex E of the Horizon Europe Work Programme General Annexes.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible Countries
described in Annex B of the Work Programme General Annexes.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon Europe projects. See the information in the Horizon Europe Programme Guide.
3. Other Eligible Conditions
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
The Joint Research Centre (JRC) may participate as member of the consortium selected for funding as a beneficiary with zero funding, or as an associated partner. The JRC will not participate in the preparation and submission of the proposal - see General Annex B.
described in Annex B of the Work Programme General Annexes.
4. Financial and operational capacity and exclusion
described in Annex C of the Work Programme General Annexes.
5a. Evaluation and award: Award criteria, scoring and thresholds
are described in Annex D of the Work Programme General Annexes.
5b. Evaluation and award: Submission and evaluation processes
are described in Annex F of the Work Programme General Annexes and the Online Manual.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in Annex F of the Work Programme General Annexes.
6. Legal and financial set-up of the grants
The granting authority may, up to 4 years after the end of the action, object to a transfer of ownership or to the exclusive licensing of results, as set out in the specific provision of Annex 5.
Eligible costs will take the form of a lump sum as defined in the Decision of 7 July 2021 authorising the use of lump sum contributions under the Horizon Europe Programme – the Framework Programme for Research and Innovation (2021-2027) – and in actions under the Research and Training Programme of the European Atomic Energy Community (2021-2025) [[This decision is available on the Funding and Tenders Portal, in the reference documents section for Horizon Europe, under ‘Simplified costs decisions’ or through this link: https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf]].
described in Annex G of the Work Programme General Annexes.
Specific conditions
described in the [specific topic of the Work Programme]
Application and evaluation forms and model grant agreement (MGA):
Application form templates — the application form specific to this call is available in the Submission System
Standard application form (HE RIA, IA)
Evaluation form templates — will be used with the necessary adaptations
Standard evaluation form (HE RIA, IA)
Guidance
HE Programme Guide
Model Grant Agreements (MGA)
Lump Sum MGA
Call-specific instructions
Detailed budget table (HE LS)
Guidance: "Lump sums - what do I need to know?"
Additional documents:
HE Main Work Programme 2026-2027 – 1. General Introduction
HE Main Work Programme 2026-2027 – 8. Climate, Energy and Mobility
HE Main Work Programme 2026-2027 – 15. General Annexes
HE Programme Guide
HE Framework Programme 2021/695
HE Specific Programme Decision 2021/764
EU Financial Regulation 2024/2509
Decision authorising the use of lump sum contributions under the Horizon Europe Programme
Rules for Legal Entity Validation, LEAR Appointment and Financial Capacity Assessment
EU Grants AGA — Annotated Model Grant Agreement
Funding & Tenders Portal Online Manual
Funding & Tenders Portal Terms and Conditions
Funding & Tenders Portal Privacy Statement
Change history
First seen 28 Sept 2026, last checked 28 Sept 2026. 2 recorded versions.
- 28 Sept 2026 · 3535f128091e
- 28 Sept 2026 · 7be4e2b48454